| Tender ID | 3975646 |
|---|---|
| Organisation Name | Directorate General Of Lighthouses And Lightships |
| Tender Brief | Corrigendum : Development Of Works For Promotion Of Tourism At Luhara Point Lighthouse |
| Last Date For Submission | 7th May, 2026 |
| Opening Date | 08 May, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 45300.00 |
| Estimated Cost | 2263469.00 |
| City | Mumbai |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | A) Dwarf wall, CC platform for gazebos-Construction of Dwarf wall for earth retaining as per the drawing no MUM/340/2022 in Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand), excavation in all kind of soil, laying Plain cement Concrete 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm) as bed concrete and coping in 150mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) complete as per the direction of Engineer-in-charge.( dwarf wall as per drawing and plastered on all three exposed sides with CM 1:4 and 15 cms below the offset) | 58.200 | Rmt |
| 2 | Earth work in rough excavation All kinds of soil, banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power road roller | 27.140 | cum |
| 3 | Dry stone pitching 22.5 cm thick including supply of stones and preparingsurface complete as per the direction of Engineer in-charge. | 118.000 | Sqm |
| 4 | Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete including laying, compacting, curing with materials, tools, labours etc. complete as directed by the engineer in charge but excluding the cost of centering and shuttering | 26.490 | Cum |
| 5 | Providing and laying in position, Centering and shuttering including strutting, propping etc. and removal of form including supply of all labours, tools, materials and finishing etc. complete as directed by the engineer in charge. 5.9.1 - for Foundations, footings, bases of columns, etc. for mass concrete | 18.280 | sqm |