Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3816889 |
|---|---|
| Organisation Name | Jawaharlal Nehru Port Trust |
| Tender Brief | Corrigendum : Repairs And Resurfacing Of Sonari Village Road At Jn Port |
| Last Date For Submission | 25th Apr, 2026 |
| Opening Date | 27 Apr, 2026 |
| Document Cost | 7080.00 |
|---|---|
| EMD | 129500.00 |
| Estimated Cost | 5476000.00 |
| City | Mumbai |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | DENSE BITUMINOUS MACADAM: Proving and laying dense bituminous macadam using crushed aggregates of Grading1, premixed with bituminous binder of specified grade of Bitumen @4.50 percent by weight of to talmixandfiller, transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level,alignment, and rolling to achieve the desired density for 76-100 mm compacted thickness. USING Batch mix type hotmixplant with SCADA, Sensor Paver, Vibratoryroller with Stone Dust filler.(VG-30 bulk bitumen rates are considered to arrive at rates) | 351.00 | Cum |
| 2 | Patch repair on already filled potholes with 20 mm premix carpet and seal coatasper MORTH specification clause 3004.1 and 3004.2 | 4675.00 | Sqm |
| 3 | Providing and applying tack coat on the prepared surface heating by fames in Boilerand spraying bitumen with sprayer on Dry / Hungry B.T. surface 3kg /10 sqm. (VG-30 bulk bitumen rates are considered to arrive at rates | 12410.00 | Sqm |
| 4 | Providing and constructing 75mm. thick Modified Penetration Macadam (MPM) road surface including all materials, preparing theexisting roadsurface, spreading 40mm. stone metal layers 30%crusher broken metal + 70% Hand broken (by breaking rubble obtained by blasting)heating and spraying the bitumen of specified grade @ 2 Kg/sqm, spreading 12 mm. size chipscompacting with three wheel staticroller having weight 8 to 10MT. to achive the desired degree of compact on as per Technical Specification Clause 506 etc. complete. Including picking of existing WBM surface. (VG-30 bulk bitumen rates are considered to arrive at rates) | 2670.00 | Sqm |
4 Days Left