Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4432837 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repairs To Brick And Plaster Work, Flooring, Sanitary Fittings, Tiling Work, Rcc Work, False Ceiling And Wall Panelling At Dgqa Residential Complex And Otm Accn At Ghatkopar And Vikhroli Under Ge (north) Santacruz |
| Last Date For Submission | 25th Jun, 2026 |
| Opening Date | 27 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 90000.00 |
| Estimated Cost | 4500000.00 |
| City | Mumbai |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Demolition of brick work/stone masonry built in cement mortar or cement lime mortar including all quoins, arches, pillars, PCC coping etc, but excluding ashlar facings, dressed stonework and precast concrete articles and removing of debris outside MD land complete all as specified and as directed by Engineer-in-Charge. | 4.00 | CUBIC METRE |
| 2 | Material and labour for brick work with sub class 'B' bricks, straight or curved on plan, exceeding 6 m mean radius, built in cement mortar 1:6 complete all as specified and as directed by Engineer-in-Charge. | 4.00 | CUBIC METRE |
| 3 | Taking down cement plaster of any description on brick or stone walls etc including raking out joints, hacking for key, scrubbing down with water etc and removing debris outside MD land complete all as specified and as directed by Engineer-in-Charge | 350.00 | SQUARE METRE |
| 4 | Material and labour for 15 mm thick rendering in cement mortar (1:6) on brick/concrete surfaces & finishing the surface even and smooth without using extra cement complete all as specified and as directed by Engineer-in-Charge. | 100.00 | SQUARE METRE |
| 5 | Material and labour for rendering 5mm thick plaster in cement mortar (1:3) on concrete surfaces of ceiling and finishing the surfaces even and smooth without using extra cement complete all as specified and as directed by Engineer-in-Charge. | 50.00 | SQUARE METRE |
6 Days Left