| Tender ID | 3272754 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Risk And Cost Contract For Rectification Of Defects Raised In Work Of Provision Of Sports Infrastructure For Gymanstics And Boxing Team At Ins Hamla |
| Last Date For Submission | 16th Apr, 2026 |
| Opening Date | 17 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 50000.00 |
| Estimated Cost | 2500000.00 |
| City | Mumbai |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling/Demolition of existing roof terracing of cement/brick concrete(un-reinforced) and existing water proofing treatment of any thickness in any position on top of roof of building, cleaning surface of roof with brush/mechanical brush and with water throughly to romove all dust/dirt and loose particles to expose bare concrete roof slab and romoval of rubbish/demolished material out side MD land complete all as specified and directed. Note: Demolition should be done chiselling | 11.48 | Cum |
| 2 | M&L brushing neat cement slurry @ 3 Kgs of cement per Sqm complete all as specified and directed. | 191.40 | Sqm |
| 3 | M/L for rendering 15 mm thick in CM 1:3 on fair faces of brick work or concrete surfaces on roof finished even and smooth using liquid water proofing compound as per manufacturers instructions Complete all as specified and directed. (Note :- Supply only liquid water proofing compound shall be measured & paid separately). | 191.40 | Sqm |
| 4 | M&L for PCC 1 : 2 :4 type B0 (using 12.5mm graded stone aggregate) as in levelling padding course over RCC roof surface including rounded or chamferred on edges etc mixed with approved water proofing compound all as per manufacturer'ss instructions on the roof surface to achieve requisite slope all as specified and directed. (Note : Supply only water proiofing compound shall be measured & paid separately) | 11.48 | Cum |
| 5 | Supply only polymer based liquid water proofing compound complete all as specified and directed. | 16.76 | ltr |