Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID4484500
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Special Repair To Ncc Pi Line Mumbai Group A And Its Units (6 Bn Ncc, 3 Bn Ncc, 5 Bn Ncc, 8 Bn Ncc, 5 Eme Coy And 61 Bn) Ncc Building At Colaba Under Age Br (central) Of Ge (west) Colaba, Mumbai
Last Date For Submission30th Jun, 2026
Opening Date02 Jul, 2026
Cost
Document Cost500.00
EMD97500.00
Estimated Cost4875000.00
Location
CityMumbai
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1Dismantling of floor hearth/wall tiles including cement mortar bedding (but not backing) and removing serviceable tiles, complete all as specified and directed.469.20Sqm
2M&L for Non skid coloured ceramic tiles 7 to 8 mm thick, area of each tiles exceeding 0.11 sqm but not exceeding 0.18 sqm as in floors including 15mm thick screed bed or bedding layer in CM (1:6) set and jointed in neat cement slurry and pointed in coloured cement to match, complete all as specified and directed.10.00Sqm
3M&L Glazed ceramic tiles in vertical surface 600x 300x 7 / 450x 300x 7mm thick set and jointed in neat cement slurry and pointed in white or colour cement to match the shade including 10mm thick rendering coat in CM 1:4.wiht 6 mm spacer filled with epoxy grout, complete all as specified and directed by engr in charge.12.50Sqm
4M&L for ceramic tiles 7-8 mm thick, area of each tiles exceeding 0.18 sqm but not exceeding 0.38 sqm as in floors including 15mm thick screed bed or bedding layer in CM (1:6) set and jointed in neat cement slurry and pointed in coloured cement to match.the shade of tiles wiht 6 mm spacer filled with epoxy grout, complete all as specified and directed by engr in charge.382.50Sqm
5M&L for ceramic tiles 7-8 mm thick, area of each tiles exceeding 0.42 sqm but not exceeding 1 sqm as in Vertical surface/skirting including 10mm thick rendering/backing coat in CM (1:4) set and jointed in neat cement slurry and pointed in coloured cement to match, complete all as specified and directed by engr in charge.64.20Sqm
30th Jun, 2026

6 Days Left

WhatsApp