Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3868456 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Special Repair To Toilets And Roof Top Of Building No P-78 At Inhs Asvini |
| Last Date For Submission | 23rd Apr, 2026 |
| Opening Date | 25 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 93300.00 |
| Estimated Cost | 4665000.00 |
| City | Mumbai |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Note : 1. The tenderer shall note that before quoting his unit rate, all items of works shall be executed in high rise building, including provision of necessary scaffolding & safety measures. 2. Removal of Debris out side MoD land and site clearance as per the direction of Engineer- in- Charge. 3. Safety eqpt to be carried all the time. 4. Scaffolding wherever reqd deemed to be included in quoted rates. 5. Contractor is solely responsible for any defect or after working situation . 6.The contractor shall submit affidavit for 05 year warranty for structural repair carried out by the firm for the portion of work (Item No. 02 to15). Pre-final RAR/Final Bill shall be released only after submission of warranty. | ||
| 2 | RELIEVING STRUCTURAL MEMBERS Relieving Structural members such as column, beam and slabs of their superimposed loads partially or fully by provision of adjustable steel props, frames etc. including providing necessary timber runners, bracing, jacking up arrangement all Complete to the satisfaction of Engineer in charge (Removing and redoing of brickwork, if required, shall be paid separately For item No 01 to 11 structural repair and strengthening, rehabilitation shall be applied by the authorised applicator only. | 100.00 | Nos |
| 3 | Chipping off existing loose, damaged Concrete from RCC members of all affected RCC Columns, Beams, Slabs and Chajjas on external and internal areas, etc carefully with chisel and hammer Providing and applying Rusticide SS Rust passivator or Techno comercial equivalent as aproved to existing r/f. bars Including wire brushing of reinforcement, cleaning washing of concrete etc complete as directed.Providing and applying two coats of Rust Preventor slurry made out of Polyalk Fixoprime or techno comercial equivalent and cement in proportion 1:1.5 to existing r/f.bars as directed complete. Providing and applying bonding coat of slurry made out of Polyalk EP or Techno comercial equivalent and cement in proportion 1:1 to concrete and r/f substrates complete as directed Providing and applying Polyalk EP or Techno comercial equivalent . Polymer Modified Cement Mortar in Required proportions(1:5:15) to RCC members Including Hand packing, curing and making the surface rough for plastering. | 100.00 | Sqm |
| 4 | Providing and laying in position reinforced cement concrete of specified grade cement with granite/quartzite/gneiss metal mixing in concrete mixer including bailing out water,compacting, finishing surface, curing and including the cost of centering and shuttering a all level Nominal Mix of 1:2:4 (1 cement OPC: 2 coarse sand : 4 graded crushed stone aggregate 20 mm nominal size. | 0.50 | Cum |
| 5 | Supplying, Drilling/Cleaning hole and injecting Hilti make ETA Approved HY-200-R chemical. Application to be designed separately for Rebars as Simply Supported, Moment or Splice Connection as per EC2/TR 023 or relevant tested and accepted rebar guidelines. The chemical should have ETA approval for seismic rebar as a minimum qualifying criterion. Drilling hole with double flute type drill bits or hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A22 battery dispenser along with piston plug. The installation and the setting instructions should be strictly followed as per the manufacturer s recommendations. The adequate diameter and embedment of rebars to be decided as per PROFIS Rebar Software & the report to be submitted to the project manager/ design engineer for approval. Scanning before drilling to be done to avoid hitting existing rebars. HY200 -10 mm dia 200mm depth.(Rates includes scaffolding cost ) Make :-Asapproved | 10.00 | Nos |