| 1 | Procurement, inspection, testing, erection, fabrication and erection of SS304L structural support members, railing etc. using own material in form of plates, beams, channel & angles using GTAW in required thicknesses . This also covers shearing, cutting, fixing, welding, tacking, dimensional checking etc as per technical specification (Filler wire will be provided as FIM) | 3500 | Kg |
| 2 | Procurement, inspection, testing, erection, fabrication and erection of SS304L Liner using GTAW in required thicknesses using own material. This also covers shearing, cutting, fixing, welding, tacking, dimensional checking, DP Testing of root and final weld layers and vacuum box testing etc as per technical specification (Filler wire will be provided as FIM) (Note: arrangements and installation for scafolding, exhaust fan for smoke removal & ventilation and other supports is in contractor's scope) | 910 | SqM |
| 3 | Procurement, Erection, Installation Testing of SS304L pipes above ground and inside buiding in following sizes, at the requisite locations [Site study, preparation-submission and approval of complete detailed engineering and GA drawings, generation of Material Take Off (MTO), physical measurement, submission and approval of QA documents such as QAP and various QA/manufacturing procedures, identification of nozzles of equipment, taking site measurements, incorporating the required changes in GA drawings, preparation and approval of pipe spool drawings, identification of procured pipes, physical measurement, installation of fittings, installaion of valves and flanges with gaskets (arranged by supplier), cutting, edge preparation, fitting, assembly, packing, levelling, clamping, fixing, alignment, complete handling, transportation, detergent washing, pickling and passivation, rinsing, marking, DP testing, inspection, tagging, bending, existing blinds of pipe EPs, and readying the same for GTAW welding as per approved spool drawings and preparation of QA documents including removal and restoration of civil/mechanical obstructions if any as per BARC technical specification, approved procedure and written clearances from EIC] (Filler wire will be provided as FIM) | | |