Tendering Authority: Bridge And Roof Company India Limited
Tender ID3980126
Organisation NameBridge And Roof Company India Limited
Tender BriefCorrigendum : Works For Execution Of Balance Civil Mechanical Electrical Plumbing Fire Fighting,hvac Signal And Telecomm.works And All Related Finishing Works On Sub Contract Basis In Connection With Redevelopment Of Udhna Station At Udhna Of Mumbai Div. In W.rly
Last Date For Submission11th May, 2026
Opening Date12 May, 2026
Cost
Document Cost100512.00
EMD5259000.00
Estimated Cost391800000.00
Location
CityMumbai
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1REDEVELOPMENT PLAN FOR UDHNA RAILWAY STATION
2Through Roof Cover Sheeting Work
3The scope of work in general includes scope of work specified in WR/SGS/BANDR s Technical Documents and Drawings enclosed in the Bidding document as following :- 1. NIT 2. EPC Agreement Schedule DC Outline Construction Specifications Quality 3. EPC Agreement Schedule DA Authority's Requirement 4. EPC Agreement Schedule DB Outline Design Specifications 5. SCHEDULE A TO SCHEDULE D 6. All Drawings 7. Approved Vendor List 8. Any other document forming part of this NIT 9. Any other document attached with this NIT Further, it includes any other work not specifically mentioned but required to complete the work as per Specifications, drawings and instructions of Engineer-in-Charge.1.00L.S.
4Signal & Telecommunication Work
5The scope of work in general includes scope of work specified in WR/SGS/BANDR s Technical Documents and Drawings enclosed in the Bidding document as following :- 1. NIT 2. EPC Agreement Schedule DC Outline Construction Specifications Quality 3. EPC Agreement Schedule DA Authority's Requirement 4. EPC Agreement Schedule DB Outline Design Specifications 5. SCHEDULE A TO SCHEDULE D 6. All Drawings 7. Approved Vendor List 8. Any other document forming part of this NIT 9. Any other document attached with this NIT Further, it includes any other work not specifically mentioned but required to complete the work as per Specifications, drawings and instructions of Engineer-in-Charge.1.00L.S.