| Tender ID | 3980126 |
|---|---|
| Organisation Name | Bridge And Roof Company India Limited |
| Tender Brief | Corrigendum : Works For Execution Of Balance Civil Mechanical Electrical Plumbing Fire Fighting,hvac Signal And Telecomm.works And All Related Finishing Works On Sub Contract Basis In Connection With Redevelopment Of Udhna Station At Udhna Of Mumbai Div. In W.rly |
| Last Date For Submission | 11th May, 2026 |
| Opening Date | 12 May, 2026 |
| Document Cost | 100512.00 |
|---|---|
| EMD | 5259000.00 |
| Estimated Cost | 391800000.00 |
| City | Mumbai |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | REDEVELOPMENT PLAN FOR UDHNA RAILWAY STATION | ||
| 2 | Through Roof Cover Sheeting Work | ||
| 3 | The scope of work in general includes scope of work specified in WR/SGS/BANDR s Technical Documents and Drawings enclosed in the Bidding document as following :- 1. NIT 2. EPC Agreement Schedule DC Outline Construction Specifications Quality 3. EPC Agreement Schedule DA Authority's Requirement 4. EPC Agreement Schedule DB Outline Design Specifications 5. SCHEDULE A TO SCHEDULE D 6. All Drawings 7. Approved Vendor List 8. Any other document forming part of this NIT 9. Any other document attached with this NIT Further, it includes any other work not specifically mentioned but required to complete the work as per Specifications, drawings and instructions of Engineer-in-Charge. | 1.00 | L.S. |
| 4 | Signal & Telecommunication Work | ||
| 5 | The scope of work in general includes scope of work specified in WR/SGS/BANDR s Technical Documents and Drawings enclosed in the Bidding document as following :- 1. NIT 2. EPC Agreement Schedule DC Outline Construction Specifications Quality 3. EPC Agreement Schedule DA Authority's Requirement 4. EPC Agreement Schedule DB Outline Design Specifications 5. SCHEDULE A TO SCHEDULE D 6. All Drawings 7. Approved Vendor List 8. Any other document forming part of this NIT 9. Any other document attached with this NIT Further, it includes any other work not specifically mentioned but required to complete the work as per Specifications, drawings and instructions of Engineer-in-Charge. | 1.00 | L.S. |