| Tender ID | 4441451 |
|---|---|
| Organisation Name | Nuclear Power Corporation Of India Limited |
| Tender Brief | Demarcation And Fixing Of Boundary By Erecting Concrete Posts For Cmpapp Plant Site Using Dgps And Total Station At Village Chutka, District Mandla. |
| Last Date For Submission | 19th Jun, 2026 |
| Opening Date | 20 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 13284.00 |
| Estimated Cost | 664194.00 |
| City | Mumbai |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Conducting revenue survey of CMPAPP Plant area of approximately 641 Hectares with reference to revenue/forest records, demarcation and fixing of external boundary points on ground at 50 meter interval or less if required using DGPS and Total Station and also carry out the erection of concrete posts at all demarcated points including establishing and construction of Permanent Benchmarks etc. as directed by Engineer in charge Note: 1) The quoted rate shall be Inclusive of supply of 3 Sets of A0 size drawings in Dwg/ UTM format representing the lat/long Coordinates of each and every points and bends if comes within 50 metres. 2) Coordination with Revenue Department/forest department for collecting the relevant documents, records in connection with Boundary demarcation shall be in scope of Contractor. Vetting of the identified boundaries with Revenue department/forest department is also in the scope of Contractor. 3) The payment of item shall be paid in stages 30% after carrying out Revenue Boundary Survey, Identification & Recording of Encroachment and Demarcation of the boundary i.e pegging on the ground, 30% after Fixing of Boundary Posts in concrete/ Soil all along the boundary, 5% on the Submission of Geo referenced AUTOCAD Drawings Plotted on Revenue map, 35% after the submission of the 3 Sets of Hard Copies & Soft Copies of drawing superimposed on Google Earth and survey report prepared by carrying out DGPS survey of erected posts. 4) The concrete posts erected shall be paid under relevant item. | 15.00 | kms |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 300.00 | SqM |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottom disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed. (No extra lift is payable if work is done by mechanical means) All kinds of soil. | 13.00 | Cum |
| 4 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work upto plinth level : M-15 Grade concrete. | 13.00 | Cum |
| 5 | Supplying at site: R.C.C. Standards post/ struts/rails/ poles of mix 1:1.5:3 (1 cement : 1.5 sand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in-charge including fixing (cost of earth works in excavation, concrete works in foundation to be paid separately). | 3.00 | Cum |