Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4818624 |
|---|---|
| Organisation Name | Forest Department |
| Tender Brief | Corrigendum : General-wall Paneling And False Ceiling Work At Dormitory-estimate For The Cost Wall Paneling And Ceiling Work Of Rrt Munnar Dormitory Under Munnar Range During 2026-27-general Civil Work |
| Last Date For Submission | 20th Jul, 2026 |
| Opening Date | 21 Jul, 2026 |
| Document Cost | 555.00 |
|---|---|
| EMD | 1650.00 |
| Estimated Cost | 65977.00 |
| City | Munnar |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Ceiling Work | ||
| 2 | 21.5 Providing and fixing powder coated aluminium work ( minimum thickness of powder coating 50 micron) consisting of tee /angle sections, of approved make conforming to IS : 733 in frames of false ceiling including aluminium angle cleats with necessary C.P brass/ stainless steel sunk screws, aluminium perimeter angles fixed to wall with stainless steel rawl plugs @ 450 mm centre to centre and fixing the frame work to G.I level adjusting hangers 6 mm dia. with necessary cadmium plated machine screws all complete as per approved architectural drawings and direction of the Engineer-in- Charge ( level adjusting hangers, ceiling cleats and expansion hold fasteners to be paid for separately ). | 3.000 | kg |
| 3 | 50.12.4.2 Providing and fixing false ceiling with 7.5 mm thick PVC wooden grains panel board ceiling of approved quality in aluminium frame work with necessary screws etc complete ( aluminium frame work shall be paid separately) | 19.965 | Sqm |
| 4 | OD29498/2026-2027 Providing and fixing internal wall panels on steel frame work with 10mm thick V Board as per standard sizes fixed with self-drilling / taping screws / fasteners @ 60cm c/c of approved make, Screws shall be of counter sunk rib head of 1.60mm to 4 mm thick or 8 to 10 gauge of length varying from 25 to 45 mm. Proper taping and jointing to be done using fiber mesh tape and epoxy and acrylic based jointing compound for seamless finish.(cost of frame work to be paid for separately | 36.955 | Sqm |
| 5 | 10.1 Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 100.050 | kg |
9 Days Left