Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4298859 |
|---|---|
| Organisation Name | Kerala Water Authority |
| Tender Brief | Corrigendum : Deposit Deposit Work At Ramamangalam Panchayath Interconnection Of Pipelines At Ramamangalam Panchayath Pipeline Work |
| Last Date For Submission | 15th Jun, 2026 |
| Opening Date | 16 Jun, 2026 |
| Document Cost | 845.00 |
|---|---|
| EMD | 9580.00 |
| Estimated Cost | 383210.00 |
| City | Muvattupuzha |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Appendix A- Interconnection at Ramamangalam | ||
| 2 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 53.325 | cum |
| 3 | 100.1.2:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not exceeding 3m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 19.125 | cum |
| 4 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 4.050 | cum |
| 5 | 16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 9.000 | sqm |
9 Days Left