Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Kerala Water Authority
Tender ID4466803
Organisation NameKerala Water Authority
Tender BriefCorrigendum : Lac Ads Providing Wss To Oliyapuram North Ward 4 Construction Of 30000 Ltrs Ohsr At Oliyapuram In Thirumarady Panchayath Pipeline Work
Last Date For Submission10th Aug, 2026
Opening Date11 Aug, 2026
Cost
Document Cost2760.00
EMD50000.00
Estimated Cost2111085.00
Location
CityMuvattupuzha
StateKerala

Register to see full details

BOQ Items
#ItemQtyUnits
1Construction OH Tank 30000 Ltr capacity (Working Charges)
215.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar12.000cum
3100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.43.720cum
44.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)1.936cum
55.33.1.1:Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement All work upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cum13.186cum
10th Aug, 2026