Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4030591 |
|---|---|
| Organisation Name | Directorate Of Local Bodies |
| Tender Brief | Nagar Palika Me Nirmanadhin Godam Ke Uper Partham Tal Per Sabhakaksh Dawithe Tal Per Smart Control Room Ke Nirman Ka Karye |
| Last Date For Submission | 23rd Apr, 2026 |
| Opening Date | 23 Apr, 2026 |
| Document Cost | 6667.00 |
|---|---|
| EMD | 1111900.00 |
| Estimated Cost | 11118406.00 |
| City | Muzaffarnagar |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in foundetion in ordinary Soil ( Loam clay or sand) including lift upto 1.5m 'ead upto 30.0 m & including filling watering and ramming of excavated earth into the space between the building & sides of foundation trenches or into the plinth and removal & disposal surplus earth as directed by the engineer 1/C within a lead of 30 m.from foundation trenches..2.8 1/DSR | 7.50 | cum |
| 2 | Cement Concrete with 4 cn gauge approved stone grit, coarse sand & cement in the proportion of 1:4:8 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. 4.1.8/DSR | 65.93 | cum |
| 3 | RC.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in lintels of door & windows excluding supply reinforcement and its bending, but including its fixing and binding sane with 24 B. W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. but in R.C.C. in 1:1 :3 (Colum: and T-Beam)......5.33.2.2/DSR | 87.23 | cum |
| 4 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in Slab excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B. W.G.G.I, binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra Si no 284.a but for slabs in 1:1.5:3 5.33.2.2/DSR | 82.20 | cum |
| 5 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire. | 332.50 | cum |
5 Days Left