Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5023854 |
|---|---|
| Organisation Name | Works Department |
| Tender Brief | Devlopment Of Papdahandi Memorial Park At Papadahandi. |
| Last Date For Submission | 3rd Aug, 2026 |
| Opening Date | 04 Aug, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 452000.00 |
| Estimated Cost | 45230859.00 |
| City | Nabarangapur |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing and grubbing Internal Internal Internal Road land including uprooting rank vegetation, grass, bushes, shrubs ,sapling and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable material and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 13,560.200 | sqm |
| 2 | Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 300 mm to 600 mm for Site Devlopment | 300.000 | nos |
| 3 | Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 600 mm to 900 mm for Site Devlopment | 200.000 | nos |
| 4 | Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 900 mm to 1800 mm for Site Devlopment | 200.000 | nos |
| 5 | Earth work in excavation in hard soil/ Gravelly soil by mechanical means (Hydraullic excavator)/manual means overareas (exceeding 30 cm in depth, 1.5 m in width as well as 10sqm on plan) inculding disposal of excavated earth up to 50 m and lift upto 1.5m with all lead andlift including shoring, shuttering & dewatering (if required) with cost of all Labour, Labourcess ,Hire & Running charges of the water pumps, T & P required for the work complete asdirected by the Engineer- in- charge. | 2,544.590 | cum |
13 Days Left