Tendering Authority: Uttar Pradesh State Construction And Infrastructure Development Corporation Limited
Tender ID4032377
Organisation NameUttar Pradesh State Construction And Infrastructure Development Corporation Limited
Tender BriefJanpad Jalaun Ke Block Nadigaon Ke Gram Trilokpura Me Mandir Ke Pas Yatri Pratikshalaya Ka Nirman Karya (under Scheme B.v.n. 2025-26) Hon Ble Shri Mool Chandra Niranjan Ji, Mla Madhogarh
Last Date For Submission23rd Apr, 2026
Opening Date23 Apr, 2026
Cost
Document Cost1062.00
EMD11500.00
Estimated Cost0.00
Location
CityNadigaon
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Yatri Pratikshalaya
2Clearing jungle including uprooting of rank vegetations grass,buss,Wood trees and sapling of girth upto 30 cm . Measured at a height of 1 metre above ground level & removal of rubbish upto a distance of 50 meters outside the periphery of area cleared.80.000sqm
3Boring with hydraulic piling rigs with power unit ,providing and ininstalling cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete ,to carry of safe working load not less than specified .excluding the cost of steel reinforcement bul including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete (length of pile for payment shall be measured upto to the bottom of pile cap)-250MM DIA29.000Rmt
4Excavation in foundation in black cotton soil (in Bundelkhand area) including lift upto 1.5 m. and lead upto 30 m. and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge a distance of 30 m. from the foundation (Drain/Edging).5.363Cum
5Cement concrete with 40 mm gauge stone ballast, approved coarse sand and cement in proportion of 1:5:10 i/c all required for proper completion of work as per directed by Engineer in charge.0.715Cum