Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3981419 |
|---|---|
| Organisation Name | Public Works Roads Department |
| Tender Brief | Corrigendum : Construction Of Raha Chaparmukh Kampur Road (from Raha To Bahakabari- Sh-35) In Nagaon District Under (crif) For The Year 2025-26. |
| Last Date For Submission | 30th Apr, 2026 |
| Opening Date | 30 Apr, 2026 |
| Document Cost | 20000.00 |
|---|---|
| EMD | 9348480.00 |
| Estimated Cost | 467424000.00 |
| City | Nagaon |
|---|---|
| State | Assam |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned up to lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm thickness. i) By Manual Means. A) In area of light jungle | 3.215 | hectre |
| 2 | Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit. '(i) Girth from 300 mm to 600 mm | 12.00 | each |
| 3 | Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit. '(ii) Girth from 600 mm to 900 mm | 6.00 | each |
| 4 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material,disposal of unserviceablematerial and stacking the serviceablematerial with all lift and lead of 1000 metres By Mechanical Means A) Cement Concrete Grade-15 & M-20 | 15.75 | Cum |
| 5 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material,disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 metres). iii) Dismantling Stone Masonry. b) Rubble stone masonry in cement mortar. | 15.75 | cum |
2 Days Left