Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Municipal Corporation
Tender ID4856484
Organisation NameMunicipal Corporation
Tender BriefConstruction Of Samajbhavan At Sharda Square Sarwajanik Vihir Near H/o Gaikwad Ganeshpeth Nagpur In Pr. No. 17
Last Date For Submission13th Jul, 2026
Opening Date14 Jul, 2026
Cost
Document Cost1180.00
EMD99000.00
Estimated Cost9854620.00
Location
CityNagpur
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. By Mechanical Means (Spec. No. : Bd.A. 1 Page 259/CSR I Page No. 148) i. Lift upto 1.5 m.73.413953488Cu.m
2Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. By Mechanical Means (Spec. No. : Bd.A. 1 Page 259/CSR I Page No. 148) ii. Lift above 1.5 m to 3.00 m.Depth48.944029851Cu.m
3Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) treatment by treating the backfill in immediate contact with foundation at the rate of 5 litres of emulsion concentrate of 1.0 percent of clorophyrifos per square metre of vertical surface area covering 10 years guarantee on bond paper.49.870689655Sq M
4Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with Crushed sand/grit, ramming, watering etc. complete.14.268693222Cu.m.
5Filling in plinth and floors with approved excavated material in 15cm. to 20cm. layers including watering and compacting etc. complete.29.145161290Cu M
13th Jul, 2026

6 Days Left

WhatsApp