Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Directorate Of Municipal Administration
Tender ID4897134
Organisation NameDirectorate Of Municipal Administration
Tender BriefCorrigendum : 2026-27 Annual Maintenance Work In Nagar Panchayat Besa-pipla
Last Date For Submission20th Jul, 2026
Opening Date21 Jul, 2026
Cost
Document Cost5000.00
EMD100000.00
Estimated Cost0.00
Location
CityNagpur
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
12026-27 Annual maintenance work in Nagar Panchayat Besa-pipla
2Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with vibratory roller to the required density. By Mechanical Means -Grading I (Using Screening Type B (11.2 mm) Aggregate)1.000Cubic Metre
3Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with vibratory roller to the required density. By Mechanical Means - Grading II (Using Screening Type B (11.2 mm) Aggregate)1.000Cubic Metre
4Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with Crushed sand/grit, ramming, watering etc. complete.1.000Cubic Metre
5Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate ( VSI grade finely washed crushed sand) conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, , cement content not to be less than 150 Kilogram/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant/ Weigh batch mixer, transported to site with all leads and lifts, laid with a paver with electronic sensor /by suitable means as approved by Engineer-in-charge , compacting with vibratory roller, finishing, curing and including preparation of sub-grade surface if required etc. complete.1.000Cubic Metre
20th Jul, 2026

2 Days Left

WhatsApp