Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: National Environmental Engineering Research Institute
Tender ID3805108
Organisation NameNational Environmental Engineering Research Institute
Tender BriefCorrigendum : Preventive Maintenance Of Transformer Ht Panel And Other Allied Works At Dzc At Csir Neeri
Last Date For Submission8th Apr, 2026
Opening Date09 Apr, 2026
Cost
Document Cost0.00
EMD1000.00
Estimated Cost42477.00
Location
CityNagpur
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1Preventive maintenance of the Transformer conforming to IS 10028 (Part-3). . . (i) Filtration of the transformer oil of a 500 KVA having 1010 Litres of oil. . . (ii) Regulator Unit having 300 litres of oil. By transformer oil filter machine, including the cost of transportation of the filter machine & oil tasting machine to the site. (Testing of oil conforming to IS: 1866) Die-electric Strength maintains up to 60 KV, and should withstand at 40 KV for one minute as required. Note: While filtration of the oil, L.T. three-phase supply and its wiring has to be arranged by the contractor at its own cost, using a DG set or another authorised method.1Job
2Replacement of gaskets of radiators joint (3/4 Nos), all L.T. Bushing joints, H.T. Bushing joints of 500 KVA Transformer. Draining out the complete oil up to the L.T. Bushing/ radiator level of the Transformer into drums. Dismantling of L.T. Connections, L.T. Bushing of the transformer. Changing of gaskets, oil seals. Retightening of L.T./H.T. Connections and Bushing of the Transformer. Then, refilling the oil into the Transformer (During the shutdown period) as required. . NOTE: 1. Filtration to be done before Commissioning of Transformer. 2. Empty Drums / barrels for draining of oil from the transformer shall be provided by the contractor at the site only at its own cost. 3.The contractor should arrange/coordinate the shutdown of the H.T. supply from the Electricity Board/ Company whenever required.1Job
3Replacement of Silica Gel Breather of Purity: UV-stabilized Polycarbonate with Aluminum end caps, Grade Full Aluminum, Powder-Coated, IP54 (IP65 with optional sealing kit) Operating Temp: -20 DegreeC to +90 DegreeC as required. Make in India product. Old breather to be handed over to the department.1Each
4Spray Painting of Regulator Unit of 94 KVA, 415 Volts by Synthetic Enamel Paint (AD grey colour) after its necessary external cleaning including the cost of Primer as required.1Job
5Supply and filling of Transformer oil for topping up of the transformer oil confirming to IS:335 having Die-electric Strength up to 60 KV, and should withstand at 40 KV for one minute (Testing of oil conforming to IS: 1866) as required.40Litres
8th Apr, 2026

6 Days Left

WhatsApp