| Tender ID | 4392192 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Maintenance Of Day To Day Complaints Of Water Supply Including Connected Items At Various Loc Under Ge Nagrota |
| Last Date For Submission | 20th Jun, 2026 |
| Opening Date | 25 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 80000.00 |
| Estimated Cost | 4000000.00 |
| City | Nagrota |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | M&L for repair/rectification of leakage to water supply distribution lines 15 mm dia to 25 mm dia GI tubing by necessary excavation, returning/filling as required, tightening of loose joints of union, elbow, socket etc, threading if required including replacement of GI union/socket/nipple as required complete all as specified and directed. | 750.00 | Each Job |
| 2 | All as per Srl item No.1 above but for GI tubing of 40 mm dia to 50 mm dia complete all as specified and directed. | 350.00 | Each Job |
| 3 | All as per Srl item No.1 above but for GI tubing of 80 mm to 150 mm dia complete all as specified and directed. | 200.00 | Each Job |
| 4 | All as per Srl item No.1 above but for GI tubing /DI /CI /MS of 150 mm dia to 300 mm dia complete all as specified and directed. Note : (i) The complaints for the above works shall be registered by contractor at the water supply complaint cell of AGE E/M (ii) Stationary required such as complaint book, job cards etc shall be arranged by the contractor and proper record shall be maintained by the contractor. (iii) Tools ,Plumber with helper and Transport with driver for attending of above complaints shall be arranged by contractor. (iv) The rate quoted by the contractor for above jobs under item No 1 to 4 shall be inclusive of cost of works under note (i) to (iii) above. (v) The said complaints shall be rectified within 12 Hrs of the registration of the complaints failing which recovery of Rs.500/commplaint shall be made for contractor's due payment (vi) The stores/item required for the works under item No 1to 4 shall be measured separately under relevant item as supply only. (vii) Excavation, returning/ filling shall be measured and paid for separately and material required for the works above shall be included to quoted rates. | 150.00 | Each Job |
| 5 | Excavation in trenches not exceeding 1.5 m wide and not exceeding 1.5 m deep including getting out in hard/dense soil complete all as specified and directed. | 140.00 | Cum |