Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4520424 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair And Maintenance Of Ac Plant Alongwith Connecting Items At Various Location Under Ge Nagrota |
| Last Date For Submission | 2nd Jul, 2026 |
| Opening Date | 07 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 70000.00 |
| Estimated Cost | 3500000.00 |
| City | Nagrota |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Notes for whole BOQ : (i) The complaints in respect of AC and other equipment to be repaired under this contract shall be registered by contractor at the E/M complaint cell of AGE E/M (ii) Stationary required such as complaint book, job cards etc shall be arranged by the contractor and proper record shall be maintained by the contractor. (iii) Tools, Technician with helper and Transport with driver for attending of all the complaints shall be arranged by contractor. (iv) The rate quoted by the contractor for the items of BOQ shall be inclusive of cost of works under note (i) to (iii) above. (v) The said complaints shall be rectified within 12 Hrs of the registration of the complaints failing which recovery of Rs.1000/ per complaint per day shall be made for contractor's due payment (vi) The stores/item required for the comlaints shall be measured separately under relevant items of BOQ (vii) The repair of AC and other equipment shall be carried out a trained ITI qualified technician only. | ||
| 2 | Material and labour for Descaling of condenser tubes required to meet the designed pressure conditions and cooling specifications for desired rate of flow of refrigerant in compressor and water in condenser including circulation of chemical inside tubes and cleaning tubes, provision of new gaskets, in every 03 months etc complete all as specified and directed. Note : Spares required to be measured and paid separately under relevent items. | ||
| 3 | 52 TR capacity at Signal Center | 4.00 | Each |
| 4 | 52 TR capacity at OPS Room | 4.00 | Each |
| 5 | 15 TR capacity at 4 ASD | 4.00 | Each |
6 Days Left