Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4964433 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Annual Repair And Maintenance of On Panjehra Bharatgarh Road Km 0/000 To 4/300 (sh P/l Patch Work Bc In Km 0/000 To 4/300 Under Mmsrry |
| Last Date For Submission | 21st Jul, 2026 |
| Opening Date | 21 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 21000.00 |
| Estimated Cost | 1047963.00 |
| City | Nalagarh |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | P/L Bitumenious macadam with 60-90 TPH batch type HMP providing an average output of 75 tonnes per hour using crushed aggreegate of specified grading premixed with bituminous binder VG-10 @ min 31% per ceat by weight of total mix and filter, transpoting the hot mix to work site | 12.0000 | Cum |
| 2 | Providing and applying prime coat with with bitumen VG-10 on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 to 1.00 kg per sqm using mechanical means as per Technical Specification Clause 502. including hauling of materials in all kinds of leads ,lifts and other incidental, as per the direction of the Engineer-in-charge. The rate including of octroi, royality, Malkana, Tol Tax, GST and other taxes imposed by the Government. | 1919.8000 | Sqm |
| 3 | Providing and laying of bituminous concreteusing 30 mm thick with 100-120 TPH batch type hot mix plant producing an avrage output of 75 tonnes per hour using crushed aggregate of specified grading, premixed with bituminous binder (VG-30) @ 5.4 to 5.6% of mix and filler transporting the hot mix to work site laying with a hydrostatic paver finishers withsensor control to the required grade level and alignment rolling with samooth wheeled vibratory and tandem rollers to achieve the desired compaction as per MORTHspecification clause No.509 complete in all respect. including carriage of materials with in all leads, lifts as per the entire satisfaction & directions of Engineer in Charge. | 47.9900 | Cum |
5 Days Left