| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling of reinforced cement concrete as in roofs, floors (other than ground floor), beam, staircases, landing, chajjas and similar suspended work. (Note: Quoted rates are deemed to include for seperating and stacking aside of reinforcement for removal under schedule of credit and removal of concrete outside MD land, by the contractor.) | 13.12 | Cubic Metre |
| 2 | Demolition of cement concrete in ground floor and pavings n.exc 15cm thick (below or above ground level) including removing demolised material out of Military station. | 71.48 | Cubic Metre |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exc. 30cm in depth,1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m, in all kind of soil as directed by Engineer-in-charge. | 1259.55 | Cubic Metre |
| 4 | M & L for earth work in excavation over areas by mechanical means (Hydraulic excavator) (exc. 30cm in depth,1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50m and exc 1.5m deep and n.exc 3.0 m , and getting out in soft rock as directed by Engineer-in-charge. | 854.25 | Cubic Metre |
| 5 | M & L for earth work in excavation over areas by mechanical means (Hydraulic excavator) (exc. 30cm in depth,1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50m and exc 3.0m deep and n.exc 4.5 m , and getting out in soft rock as directed by Engineer-in-charge. | 347.4 | Cubic Metre |