Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5018785 |
|---|---|
| Organisation Name | Irrigation And Waterways Department |
| Tender Brief | Raising, Strengthing And Improvement Of Sundarban Embankment From Ch. 16.045 Km To Ch. 16.645 Km For A Length Of 600.0 M In Mouza Laxmipur Abad, Block Namkhana, P.s. Frezarganj Costal, Dist South 24 Parganas. |
| Last Date For Submission | 10th Aug, 2026 |
| Opening Date | 12 Aug, 2026 |
| Document Cost | 750.00 |
|---|---|
| EMD | 570948.00 |
| Estimated Cost | 28547405.00 |
| City | Namkhana |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land, including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile,levelling as per direction ofthe Engineer-in-charge within a lead of, N B : Measurement to be taken on the basis of stack measurement/prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. Beyond 500 metre and upto 1.00 Km | 6572.000 | Cum. |
| 2 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land, including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile,levelling as per direction ofthe Engineer-in-charge within a lead of, N B : Measurement to be taken on the basis of stack measurement/prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. Beyond 4 Km. and upto 5.00 Km | 23001.000 | Cum. |
| 3 | Earthwork in making new embankment /ringbundh /retired embankment by excavation of earth from borrow pits in all kinds of soil including making berms and depositing the same in layers not exceeding 25cm. asper profile within an initial lead of 30 metre and lift of 1.5 metre including cost of nicking out lines,dug-belling, putting profiles, cutting and removing thick and thorny jungles, uprooting trees and stumps of all sizes upto30cm.,girth from the site alignment as perdirection of the Engineer-in-Charge including dewatering, removal of weeds ,carcasses, organicmatteretc., if any,breaking clods,rough dressing ,watering,ramming,compacting etc. complete. (Work to be executed on section measurement by pre-work & post-work level section) A. Where land for earth owned/arranged by the Department. | 3285.800 | Cum. |
| 4 | Compacting earth work in embankment in layers of 25 cms. by power roller or by any other mechanical means, like tractor driven sheep foot roller/vibrating plate compactor earth rammer etc.( Not at OMC) including necessary watering, labour charges, hire charges, hire charges of all materials, tools & plants etc. and including cost and supply of all materials complete as perdirection of the Engineer-in-charge.( Payment will be made on the basis of Pre-works & Post-work level). | 32858.000 | Cum. |
| 5 | Earthwork in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing spreading or stacking the spoils within a lead of 75 metre as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. A) Depth of excavation not exceeding 1500 mm. | 1245.000 | %Cum. |
20 Days Left