Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Rural Development Department
Tender ID4246612
Organisation NameRural Development Department
Tender BriefConstruction Of Bamboo Foot Bridge Foundation And Substructure 60m Span At Khadipada Vp Katri Tal- Dhadgaon Dist- Nandurbar
Last Date For Submission18th May, 2026
Opening Date19 May, 2026
Cost
Document Cost1000.00
EMD13000.00
Estimated Cost1367123.00
Location
CityNandurbar
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavation for foundation in hard murum and boulders including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. a) Upto 1.50m lift Normal Rate b) 1.50m to 3.00m lift, Add 10% c) 3.00m to 4.50m lift, Add 20% d) 4.50m to 6.0m lift, Add 30%61.660Cubic Meter
2Providing and laying in situ / ready mix / ready mix M10 cement concrete of trap/ granite/ quartzite/ gneiss metal in foundation including necessary centering, formwork, bailing out water, compacting and curing etc. complete. (with fully automatic micro processor based PLC with SCADA enabled with reversible drum type mixer/ concrete batch mix plant (pan mixer) with natural /artifical sand)5.090Cubic Meter
3Providing and fixing 25mm diameter steel anchor dowel in hard rock including drilling hole of 32 mm diameter up to 0.75 mtrs depth, placing the dowel in position and effectively grouting the hole with CM 1:1 proportion etc. complete.88.000Number
4Providing and laying Cast in situ/Ready Mix cement concrete M-30 of trap metal for R.C.C. pile caps as per detailed designs and drawings, including bailing out water manually, centering, formwork, laying/ umping, compacting, finishing and curing etc. with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) complete (Excluding steel reinforcement)22.280Cubic Meter
5Providing and laying in situ / ready mix M-30 cement concrete of trap /granite/quartzite/ gneiss metal for cast in citu R.C.C. solid piers,column etc . including provision of V shaped false joints to form suitable panels on the faces to approve design with compacting by vibrating and curing complete. Including plywood/steel formwork, centering ( excluding dewatering by means of pump) and including bailling out water and including CM 1:3 curing complete. a) Height upto 5 M. (With Concrete Mixer) i) Height up to 5 m, normal rate. ii) Height 5 to 7.50 m, add 5 percent extra over basic rate. iii) Height 7.50 to 10 m, 7.50 percent extra. iv) Over 10 m Height, add 10 percent extra for every 2.50m rise.13.290Cubic Meter
18th May, 2026

6 Days Left

WhatsApp