Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4042928 |
|---|---|
| Organisation Name | Directorate Of Urban Local Bodies |
| Tender Brief | Installation Of New Street Light Ward No. 01 To 23 In Mc Narwana (recall) |
| Last Date For Submission | 27th Apr, 2026 |
| Opening Date | 28 Apr, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 11000.00 |
| Estimated Cost | 549958.00 |
| City | Narwana |
|---|---|
| State | Haryana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | [24.11.19]LT CABLES (Aluminium Conductor, Armoured and Unarmoured) PROVIDING AND ERECTION/LAYING OF PVC/ XLPE INSULATED UNDERGROUND ALUMINIUM CONDUCTOR CABLE 0.75 METER BELOW GROUND LEVEL COVERED WITH SAND AND BRICKS INCLUDING EXCAVATION AND REFILLING OF TRENCHES 19. 16 Sq mm 2 core (UnArm.) [Through Rate] | $1422.000 | Metre |
| 2 | [24.4.4.2]STREET LIGHT 4.2. Erection of street light fitting on the pole including the cost of petty material required (irrespective of height/length of bracket) At Pole above 4.5 metres but up to the height of 7 metres. [Through Rate] | $675.000 | Each |
| 3 | [23.5.6.1]COPPER WIRING IN EXISTING PVC/MS CONDUIT PIPE SURFACE/RECESSED FOR ELECTRICAL POINTS 6.1. Wiring main and sub mains in two single core for phase and neutral wire and one single core for earth wire PVC insulated Copper conductor cable 1100 Volts grade in existing MS/PVC Conduit etc as required. 1 run of Size 1.50 Sqmm(1/1.40mm) [Through Rate] | $1500.000 | Metre |
| 4 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | $500.000 | Kg. |
| 5 | [23.8.1.11]FITTING AND ACCESSORIES 1.11. Providing and fixing Piano type accessories of approved make in existing box and Bakelite sheet including fixing and making necessary connections, complete in all respect. Bed switch [Through Rate] | $675.000 | Each |
6 Days Left