Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID4917732
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Flyproofing And Comprehensive B/r Repairs To Accn, Toilets, Bathrooms And Kitchens Including Water Proofing, Painting And Associated Works In The Aor Of Age B/r Nrc At Arty Centre Under Ge Nrc
Last Date For Submission14th Aug, 2026
Opening Date21 Aug, 2026
Cost
Document Cost1000.00
EMD205000.00
Estimated Cost13000000.00
Location
CityNashik
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1Taking down carefully existing bituminous membrane/tarfelt treatment any description and cleaning and making good damaged surface of roof, parapet, facia etc in cement mortar 1:3/PCC 1:2:4 including complete removal of swollen plaster and concrete wherever directed and removing rubbish out of defence land all as directed by Engr-in-charge Note : Any damage to existing assets/EIectrical wiring/fittngs/fixtures shall be made good by the contractor without any financial cost to the department.The same shall deemed to be included in the contractor,s quoted rate.This note shall be applicable to all BOQ Items2,000.00Sqm
2M and L for rendering 15 mm thick in CM 1:4 with liquid waterproofing compound as per manufacturers instructions on roof surfaces, parapets, facias, chajjas etc.all as directed Note : 1 Waterproofing compound shall be measured and paid separately. 2 Quoted rate shall also deemed include for hacking over roof, parapet, facia, chajja surfaces for proper bonding of plaster/PCC. Work is to be executed at any height and any situation.2,000.00Sqm
3M & L for Waterproofing treatment on roof including flashing and junctions of parapet, kerb, wall etc as under :- (a) Laying a layer of APP based polymeric membrane, 3 mm thick(minimum), weighing not less than 3.60 kg/Sqm prefabricated five layer waterproofing membrane reinforced with polyester non woven fabric (weighing not less than 160 gms/sqm) shall be applied over compatible primer at 0.25 litre/sqm of density at 25 degree centigrade 0.87-0.89 kg/litre and viscosity 70-160cps or cold sticker,application of APP modified membrane shall be by torch application. The overlaps shall be minimum 150mm on the transverse direction and 100mm on the longitudinal direction. (b) APP membrane, Primer and bitumastic aluminium paint and bitumen shall be of same brand. (c) For vertical surfaces of parapet, wall etc APP membrane shall be tucked into groove and sealed with weatherproof silicon sealant" using gun (full width/depth of groove). (d) Painting the exposed APP membrane surface with bituminous aluminium paint @ 0.15kg/sqm 2,000.00Sqm
4Note for Item No.3:- 1. Work to be executed at any height and situation and make shall be approved by GE. 2. The contractor shall enter into a Tripartite Memorandum of Understanding (MoU) with the APP membrane manufacturer, PU based water proofing manufacturer and elastomeric water proofing manufacturer and their authorised applicator before commencement of waterproofing work. The Tripartite MoU shall clearly define the responsibilities of the contractor, manufacturer, and authorised applicator with respect to supply, application, supervision, testing, quality assurance, warranty and rectification of defects.
5M & L for applying three coats of chemical waterproofing on roof/wall surfaces including preparation of surfaces all as directed by Engr-in-charge 200.00Sqm
14th Aug, 2026

6 Days Left

WhatsApp