| Tender ID | 4606070 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repairs, Maintenance Of Transformers, Vcbs And High Power Switch Gear And Allied Works Under Ge Deolali |
| Last Date For Submission | 17th Jul, 2026 |
| Opening Date | 24 Jul, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 118000.00 |
| Estimated Cost | 6180000.00 |
| City | Nashik |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Preventive maintenace/ servicing of 11KV VCBs of make CG/ABB of capacity 400Amp/ 800Amps by dismantling of breaker mechanism checking the various critical setting in mechanism, checking of spring charging mechanism, checking of pole contact setting, greasing/ lubricating of mechanism moving parts, checking of contact pressure, alignment and adjusting the same, adjusting of spring charging mechanism & triping test trial & testing of VCBs for smooth and correct fuctioning. Calibration of over load current and earth fault relay of make L&T/ Ashida/ CG through secondry injection method with artificial load for 11 KV all as specified & directed. | 16.00 | Job |
| 2 | Preventive maintenace/ servicing of 33 KV VCBs/ 400 Amps of make ALSTOM/CG/ABB by dismantling of breaker mechanism checking the various critical setting in mechanism, checking of spring charging mechanism, checking of pole contact setting, greasing/ lubricating of mechanism moving parts, checking of contact pressure, alignment and adjusting the same, adjusting of spring charging mechanism & triping test trial & teting of VCBs for smooth and correct fuctioning. Calibration of over load current and earth fault relay of make L&T/ Ashida/ CG through secondry injection method with artificial load for 33 KV all as specified & directed. | 4.00 | Job |
| 3 | M&L for replacement of old silica gel breather container with new one of suitable capacity (500g-1000g) complete all as specified for trasformer 63 KVA to 500 KVA all as directed. | 20.00 | Each |
| 4 | Supply and fill silica gel crystal in the transformer breather container all as directed at site | 18.00 | Kg |
| 5 | Filtration of Oil of serviceable distribution/power transformers at site in running condition by heating process taking out the moisture and impurities under vacuum and refilling in transformer upto required level having Die-electric strength not less than 40 KV for 2.5 mm Gap all as specified and directed | 35000.00 | Ltrs |