Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4609984 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repairs To False Ceiling Leakage/seepage, Water Proofing Treatment , Roof Ac Sheet And Valley Gutter In Technical Area At Af Stn Ojhar |
| Last Date For Submission | 11th Jul, 2026 |
| Opening Date | 13 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 90000.00 |
| Estimated Cost | 4500000.00 |
| City | Nashik |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Taking down cement plaster of any description including racking out joints, hacking for key scrubbing down with water etc and removal of entire debris as ordered outside MD land complete all as directed. | 759.31 | Square Metre |
| 2 | Taking down carefully existing bitumen tarfelt including cement screed any thickness ,cleaning the surface and make free of dirt, foreign particles, laitance followed by grinding all protrusions to make surface modulated and removing all foreign materials / Bituminous primer completely , cleaning and washing the existing surface of roof/slab, terraces including flashings and junctions of parapets/kerb walls etc to the utmost satisfaction of Engineer-in-charge including removal of entire debris as ordered outside MD land complete all as directed. .(Note : Contractor will not throw the debris and suitable arrangements shall be made to take down the materials from roof). . | 300.00 | Square Metre |
| 3 | Removing of tree roots of any girth and height , shrubs and bushes from wall surface/roof top/chajjas up to 15 M height including repairing of cracks and filling the tree root channels and dismantled areas apply a coat of concentrated Glyphosate (41% SL) or Triclopyrwith approved chemical and render unfit for growth of vegetation on building surface and finally making good in cement mortar 1:3 and to match the surface with existing finishes including all T&P required and considering all saftey measures to carry out work upto ht 15 mtrs of bldg etc completed and removal of the complete vegetation outside MD land complete all as directed. | 5.00 | Each Job |
| 4 | Taking down plaster entire plaster around rainwater spot of size 450x450mm and M&L 10 mm thick plaster the surface with cement mortar 1:3 in slopemixed with water proofing compund @2% weight of cement toward rain water pipe spot all as specified and directed. (Note : WPC measured & Paid separately). | 2.00 | Each |
| 5 | Demolition of plain cement concrete of any description and in any position not otherwise specifically provided for in this Schedule nd removal of debris as ordered outside MD land complete all as directed. | 12.65 | Cubic Metre |