Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3812348 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Welcome Maint And Miscellaneous Repair To Plaster, Flooring Sanitary Fittings, Joinery Etc In Offrs Accn Of South Area Under Age B/r-ii At Ge Nasirabad. |
| Last Date For Submission | 18th Apr, 2026 |
| Opening Date | 20 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 90000.00 |
| Estimated Cost | 0.00 |
| City | Nasirabad |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | M & L for complete removal of existing treatment of old plastered surfaces of wall and applying two coats of oil bound distemper having VOC content lessthan 50 gms /Ltr of approved manufacturer of required shade and colour, over a coat of primer over & including 1mm thick finished coat of white wall care white putty (JK/Birla), complete all as specified and directed. | 4000.00 | Sqm |
| 2 | M&L for washing, rubbing down, preparing and stopping of old distempered surfaces, removing nails, making good holes, cracks etc and applying one coat of oil bound distemper on wall white or tinted, complete all as specified and directed. | 4000.00 | Sqm |
| 3 | Material & Labour for complete removal of existing treatement of old plastered surfaces of wall and applying Two coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & ungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over plastering surfaces, complete all as specified and directed. MAKE :- ASIAN/APEX/BERGER (Weather coat all guard) | 1000.00 | Sqm |
| 4 | M&L for preparation of old decorated plaster or un- plastered surfaces and providing one coat of white wash on wall including cornices, complete all as specified and directed. | 1000.00 | Sqm |
| 5 | All as per item No. 4.00 here in before but on ceilings complete all as specified and directed. | 2000.00 | Sqm |
6 Days Left