| Tender ID | 4424964 |
|---|---|
| Organisation Name | Andaman Lakshadweep Harbour Works |
| Tender Brief | Corrigendum : Special Repairs To Saroj Jetty At Haddo Wharf In Sri Vijaya Puram |
| Last Date For Submission | 15th Jun, 2026 |
| Opening Date | 16 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 226562.00 |
| Estimated Cost | 0.00 |
| City | Nicobar Island |
|---|---|
| State | Andaman and Nicobar Islands |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Scaffolding : Providing and fixing double scaffolding system (cup lock type ) on the exterior side, up to seven storey height made with 40mm dia M.s tube 1.5 m center to centre with M.S tube , M.S Challies , M.S Clamps and M.S staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings runners, connection with the building etc. wherever required for inspection roof work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer -in-charge . The plan/elevation area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding shall be measured for payment purpose . The payment will be made once irrespectve of scaffolding.(Transportation of all material to from Sri Vijaya Puram to work site shall be paid separately). | 707.00 | Sqm |
| 2 | Surface preparation to receive micro concrete by chipping to depth of max.75mm, cleaning, removing the traces of dust, loose concrete etc.including cost of all labour charges, minor tools, labour cess, GST etc.complete. | 715.00 | Sqm |
| 3 | Replacement of reinforcement as additional bars including bending, cutting, welding and fixing, including cost of steel, transportation charges, all labour charges, minor tools, labour cess, GST etc.complete. | 60.00 | Qtl |
| 4 | Steel centering and shuttering including strutting proping etc.and removal of form for :Columns, Pillars, Pipes, Abutments, Posts and struts, including cost of all materials, all labour charges, minor tools, labour cess, GST etc.complete. | 715.00 | Sqm |
| 5 | Drilling holes in the existing structure with mechanized boring machine to an average dia of 100mm at required location for pouring the micro concrete including cost of all labour charges and machineries etc.complete. | 223.00 | Nos |