Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Andaman Lakshadweep Harbour Works
Tender ID4424964
Organisation NameAndaman Lakshadweep Harbour Works
Tender BriefCorrigendum : Special Repairs To Saroj Jetty At Haddo Wharf In Sri Vijaya Puram
Last Date For Submission15th Jun, 2026
Opening Date16 Jun, 2026
Cost
Document Cost0.00
EMD226562.00
Estimated Cost0.00
Location
CityNicobar Island
StateAndaman and Nicobar Islands

Register to see full details

BOQ Items
#ItemQtyUnits
1Scaffolding : Providing and fixing double scaffolding system (cup lock type ) on the exterior side, up to seven storey height made with 40mm dia M.s tube 1.5 m center to centre with M.S tube , M.S Challies , M.S Clamps and M.S staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings runners, connection with the building etc. wherever required for inspection roof work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer -in-charge . The plan/elevation area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding shall be measured for payment purpose . The payment will be made once irrespectve of scaffolding.(Transportation of all material to from Sri Vijaya Puram to work site shall be paid separately).707.00Sqm
2Surface preparation to receive micro concrete by chipping to depth of max.75mm, cleaning, removing the traces of dust, loose concrete etc.including cost of all labour charges, minor tools, labour cess, GST etc.complete.715.00Sqm
3Replacement of reinforcement as additional bars including bending, cutting, welding and fixing, including cost of steel, transportation charges, all labour charges, minor tools, labour cess, GST etc.complete.60.00Qtl
4Steel centering and shuttering including strutting proping etc.and removal of form for :Columns, Pillars, Pipes, Abutments, Posts and struts, including cost of all materials, all labour charges, minor tools, labour cess, GST etc.complete.715.00Sqm
5Drilling holes in the existing structure with mechanized boring machine to an average dia of 100mm at required location for pouring the micro concrete including cost of all labour charges and machineries etc.complete.223.00Nos
15th Jun, 2026

4 Days Left

WhatsApp