Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3847539 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Special Repair / Replacement Of Old Unserviceable Aluminium Wiring To Copper Wiring Including Connected Fittings And Fixtures At Gh Md Accn Block No 24/2, 24/3 , 25/3 And Circle Block No 5 (06 Qtrs) And Provn Of 01 X 20 Kva Ups At Itfc |
| Last Date For Submission | 17th Apr, 2026 |
| Opening Date | 24 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 71600.00 |
| Estimated Cost | 3580000.00 |
| City | Nilgiris |
|---|---|
| State | Tamil Nadu |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Taking down copper/aluminium point wiring (light, fan, socket or power) complete, including fixture and fittings such as switches, ceiling roses, pendants, regulators, sockets, light fitting etc. removing materials for taking credit (credit for above items should be made as per conditions separately) and making good disturbed surfaces of walls, floors, etc.. complete all as specified and directed. | 680.00 | Per Point |
| 2 | Taking down old sub-main wiring incl fixture & fittings etc. removing materials to store for keeping in safe custody or for taking credit & making good the disturbed surfaces of walls, floors, etc. complete all as specified and directed. | 830.00 | RM |
| 3 | Disconnect and taking down existing exhaust fan of size 250mm sweep or 300 mm sweep with louver and hand over to MES store yard for safe custody. | 36.00 | Each |
| 4 | Disconnect and taking down carefully electrical geysers of capacity upto 50 ltrs by unscrewing nuts and bolts from clamps, disconnecting electrical connections and PVC cold/hot water connections and keeping serviceable geysers in safe custody for refixing complete all as specified and directed. Note: The cost of transportation and depositing the unsv geysers to the MES stores is deemed to be included in the unit quoted rates. | 18.00 | Each |
| 5 | Labour only for Refixing the serviceable Geyser in the same or different original position/location making the electrical connection, testing after installation complete all as specified and directed. | 14.00 | Each |
6 Days Left