Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID3847539
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Special Repair / Replacement Of Old Unserviceable Aluminium Wiring To Copper Wiring Including Connected Fittings And Fixtures At Gh Md Accn Block No 24/2, 24/3 , 25/3 And Circle Block No 5 (06 Qtrs) And Provn Of 01 X 20 Kva Ups At Itfc
Last Date For Submission17th Apr, 2026
Opening Date24 Apr, 2026
Cost
Document Cost500.00
EMD71600.00
Estimated Cost3580000.00
Location
CityNilgiris
StateTamil Nadu

Register to see full details

BOQ Items
#ItemQtyUnits
1Taking down copper/aluminium point wiring (light, fan, socket or power) complete, including fixture and fittings such as switches, ceiling roses, pendants, regulators, sockets, light fitting etc. removing materials for taking credit (credit for above items should be made as per conditions separately) and making good disturbed surfaces of walls, floors, etc.. complete all as specified and directed.680.00Per Point
2Taking down old sub-main wiring incl fixture & fittings etc. removing materials to store for keeping in safe custody or for taking credit & making good the disturbed surfaces of walls, floors, etc. complete all as specified and directed.830.00RM
3Disconnect and taking down existing exhaust fan of size 250mm sweep or 300 mm sweep with louver and hand over to MES store yard for safe custody.36.00Each
4Disconnect and taking down carefully electrical geysers of capacity upto 50 ltrs by unscrewing nuts and bolts from clamps, disconnecting electrical connections and PVC cold/hot water connections and keeping serviceable geysers in safe custody for refixing complete all as specified and directed. Note: The cost of transportation and depositing the unsv geysers to the MES stores is deemed to be included in the unit quoted rates.18.00Each
5Labour only for Refixing the serviceable Geyser in the same or different original position/location making the electrical connection, testing after installation complete all as specified and directed.14.00Each
17th Apr, 2026

6 Days Left

WhatsApp