Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4037108 |
|---|---|
| Organisation Name | Greater Noida Industrial Development Authority |
| Tender Brief | Construction Of 60 M Service Road From Wipro Rotary To Labour Chowk (delta-1/2) Rotary Via Eta-1 Rotary, Greater Noida. |
| Last Date For Submission | 27th Apr, 2026 |
| Opening Date | 29 Apr, 2026 |
| Document Cost | 3160.00 |
|---|---|
| EMD | 396000.00 |
| Estimated Cost | 19753073.00 |
| City | Noida |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m. in depth and earth work in embankment to be in 20 cm. layers including remming and dressing the surface to required levels and slops and also including 1.50 m. lift and 30M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30M. distance as directed by the Engineer incharge. excluding Royallity. Wherever applicable for small work or abadi area. (Where machine can not reach/move) (SOR-20/4.03/253(a)) | 2692.27 | Cum |
| 2 | Excavation in foundation in ordinary soil (Lorm,Clay or sand ) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removel and disposal of surplus earth as directed by the engineer incharge upto distance of 30 M.from the foundation trenchess.( where machine con not reach / move ). (SOR-20/4.01/251(a)) | 1074.46 | Cum |
| 3 | Cartage of earth or fly ash when added to schedule item no. 253. 2nd km and beyond Lead upto 3.00 km (SOR-20/4.08/261(C)) | 7189.79 | Cum |
| 4 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth dressing to camber and consolidating with road roller including making good the undulations etc.and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres. (DSR-18/16.1/AR) | 8328.80 | Sqm |
| 5 | Granular Sub-Base with Coarse Graded Material (Table:- 400- 1) Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. (MoRTH-20/401) | 912.66 | Cum |
9 Days Left