Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: New Okhla Industrial Development Authority
Tender ID3935425
Organisation NameNew Okhla Industrial Development Authority
Tender BriefConstruction Of Puzzle Parking At Parking Plot Pk-1, Sector 124, Noida.
Last Date For Submission20th Apr, 2026
Opening Date21 Apr, 2026
Cost
Document Cost8260.00
EMD2910000.00
Estimated Cost145467770.00
Location
CityNoida
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Clearing jungle including uprooting of rank vegitation, grass, brush wood, trees and saplings of girth upto 30cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared.6846.32Sqm
2Earthwork in embankment in ordinary soil embankment to be in 20cm layers including ramming, dressing the surface to required levels with half tonne steel or wooden rammer and rolling every third and top most layer in roller 8 to 10 tonne cpacity and including 1.5 mtr lift and all lead (earth shall be brought from a place which including cartage of earth by mechanically transport and T&P labour etc. required for proper completion. earth shall be arranged by the contractor at his own cost.5868.00CUM
3Excavation in foundations in Ordinary Soil (Loam Clay or sand) including lift upto 1.5m. (5 fts.) and lead upto 30 m. (100 fts.) & including filling, watering and ramming of excavated Earth into the trenches or into the Space between the building and sides of foundation trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-incharges upto a distance of 30m. (100fts.) from the foundation trenches. FOOTINGS, PLINTH BEAM & UGWT1284.25CUM
4Same as in item No. 01 above but excavation in soil mixed with Moorum,shingle kanker etc, requiring the use of special T&P such as pickaxes : sabbals etc.128.43CUM
5Add to item 01 for every additional 30m. (100 fts.) lead or part of 30m. (100 fts.) or for every additional 1.5 m. (5fts.) lift or part of 1.5m. (5fts.).429.19CUM
20th Apr, 2026

13 Days Left

WhatsApp