Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4822225 |
|---|---|
| Organisation Name | Uttar Pradesh Projects Corporation Limited |
| Tender Brief | Corrigendum : Additional Work In Cleaning Of Choked Sewer Line Work And Repairing Work Of Sewer And Manholes At Premises Of Government Institute Of Medical Sciences Greater Noida (gims), Gautambudha Nagar |
| Last Date For Submission | 16th Jul, 2026 |
| Opening Date | 16 Jul, 2026 |
| Document Cost | 3540.00 |
|---|---|
| EMD | 15000.00 |
| Estimated Cost | 745000.00 |
| City | Noida |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | SEWER LINE Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 795.00 | Sqm |
| 2 | Cleaning of chocked sewer line by diesel running vehicle mounting hydraulic operated high pressure suction cum jetting sewer cleaning machine fitted with pump having 4000 litres suction capacity and 6000 litres water jetting tank capacity including skilled operator, supervising engineer etc. for cleaning and partial desilting of manholes and dechocking of sewer lines. Dechocking and flushing of sewer line from one manhole to another by high pressure jetting system of 2200 PSI for sewer line from 150mm dia upto 300mm dia for all depth. | 165.00 | Mtr |
| 3 | Cleaning and desilting of gully trap chamber, including removal of rubbish mixed with earth etc. and disposal of same, all as per the direction of Engineer-in-charge. | 15.00 | Each |
| 4 | Dismantling asbestos cement pressure pipes including excavation and refilling trenches after taking out the pipes manually/ by mechanical means and stacking the pipes within 50 metres lead as per direction of Engineer-in-charge : Above 150 mm diameter | 100.00 | Mtr |
| 5 | Dismantling of manhole including R.C.C. top slab, C.I. cover with frame, including stacking of useful materials near the site and disposal of unserviceable materials, all as per direction of Engineer -in-Charge :Circular manhole 122 cm diameter and 1.68 m deep | 8.00 | Each |
2 Days Left