| 1 | GST % for the tender
Please select the rate of GST in cell AY13. Rate selected shall be applicable for the entire BoQ.
| | |
| 2 | CSW Service - Mech - Vallur | | |
| 3 | "Booster Pumping Unit Installation:Booster Pumping Units Installation_A.i.2 Booster Pumping Unit Installation:, Taking delivery of b ooster pumping units having electrical motor & vertical turbine type centrif ugal pump and accessories from designated storage locat ion within the pump station, shifting and placing the equipments on the pre- constructed foundation, levelling, grouting and aligni ng the equipment, assembling together of all sub-assemblies, auxiliaries, moun tings, fittings, interconnecting piping etc., carryin g out trial run of motor on no load, coupling the electrical motor with the pum p, making final alignment, checking and testing of t he complete pumping unit and completing the work in all respects in accordance w ith the specification, drawings, manufacturer's ins tallation instructions, technical specifications and as per the instruction of th e Site Engineer / EIC., , Note: Electrical & Instr umentation connections are not included in this item., Note: Weight of equipment i s indicative only, Payment shall be done based on actual weight of equipment, Booster Pumping Units Installation_A.i.2" | 60.00 | TO |
| 4 | "Sump Pump Installation:Sump Pump_A.i.7 ""Sump Pump Installation:, Taking delivery of the following pumping units with electrical mo tors from designated location within sta tion premises, shifting/transporting to site, placing over Sump Tank Nozzle, assembling tog ether all sub-assemblies, alignment, grou ting, levelling, checking, providing assistance for taking trial run of electrical motor o n no-load, coupling the pump & motor, carr ying out the trial run of the complete unit, testing, making final alignment and complete work in all respects in accordance with t he relevant drawings, manufacturer's installation instruction, specifications and instru ctions of Site Engineer / EIC., , Note: Weig ht of equipment is indicative only, Payment shall be done based on actual weight of equ ipment, "" Sump Pump_A.i.7" | 3.00 | TO |
| 5 | Above Ground Equipments Installation:, Taking delivery of equipments, shifting/transporting within station premises, placing on pre -constructed foundations, assembling together all sub-assemblies, levelling, alignment, grouting, cleaning and flushing by water, d r aining, checking, testing, dressing and making good of the foundation and completing the work in all respects in accordance with th e relevant drawings, manufacturer's installation instruction, specifications and instructions of Site Engineer / EIC., Note: Weig ht of equipment is indicative only, Payment shall be done based on actual weight of equipment | | |