Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: New Okhla Industrial Development Authority
Tender ID3929475
Organisation NameNew Okhla Industrial Development Authority
Tender BriefMaintenance of Building (c/o Toilet Nearby Vds Market Sector-51) Noida
Last Date For Submission20th Apr, 2026
Opening Date21 Apr, 2026
Cost
Document Cost1416.00
EMD21000.00
Estimated Cost1037069.00
Location
CityNoida
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exccding 30 cm in depth, 1.5m in width or 10 sqm on plan) including disposal of excavated lead upto 50 mtr. & lift upto 1.5Mtr. dispose earth to be leveled & dressed. : All kinds of soil. The Contractor has to detect Different utilities like sewer line, water Supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge22.30Cum
2Filling avilable excavated earth (excluding rock) in trenches, plinth, side of foundation etc, in layers not exceeding 20 cmm depth, consolidating each deposited layer by ramming and watering, lead up to 50 and lift upto 1.5 m. Item N.2.2511.15Cum
3Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) DSR 18/I.No. 4.1.8/P-14.40Cum
4Reinforced cement concrete work in beams, suspended floors roofs having slope up to 15 degree landings balconies shelves chajjas lintels bands plain window sills staircases and spiral stair cases above plinth level up to floor five level excluding the cost of centering shuttering finishing and reinforcement with 1:1.5:3(1 cement: 1.5 coars sand ( zone- III ) : graded stone aggregate 20 mm nominal size ).16.00Cum
5Centring and shuttering including strutting, propping etc. and removal of form work for. Foundation, footings, bases of Columns etc for mass concrete.16.60Sqm
20th Apr, 2026

13 Days Left

WhatsApp