Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: New Okhla Industrial Development Authority
Tender ID3930964
Organisation NameNew Okhla Industrial Development Authority
Tender BriefMaintenance of Building (c/o Toilets Near L.i.g, M.i.g, H.i.g And E.w.s Flats In Sector-99) Noida
Last Date For Submission20th Apr, 2026
Opening Date21 Apr, 2026
Cost
Document Cost2124.00
EMD67000.00
Estimated Cost3349968.00
Location
CityNoida
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (Hydraulic excavator) / manual mcans in foundation trenches or drains (not excceding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. The contractor has to detcet different utilitys like sewer line, water supply line, Electric cable, Telephone cablc, Gas Pipe etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission or Engineer in Charge. All kirds of soil. DSR-18/I.No.2.8.166.90Cum
2Filling avilable excavated earth (excluding rock) in trenches, plinth, side of foundation etc, in layers not exceeding 20 cmm depth, consolidating each deposited Cum layer by ramming and watering, lead up to 50 and lift upto 1.5 m. Item N.2.2533.45Cum
3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work up to plinth 1:4:8 ( 1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) DSR-18/I.NO. 4.1.848.00Cum
4Reinforced cement concrete work in beams, suspended floors roofs having slope up to 15 degree landings balconies shelves chajjas lintels bands plain window sills staircases and spiral stair cases above plinth level up to floor five level excluding the cost of centering shuttering finishing and reinforcement with 1:1.5:3(1 cement: 1.5 coars sand ( zone- III ) : graded stone aggregate 20 mm nominal size ) I.NO. 5.348.00Cum
5Centring and shuttering including strutting, propping etc. and removal of form work for. Foundation, footings, basesof Columns etc for mass concrete.I.NO.5.9.151.00Sqm