Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: New Okhla Industrial Development Authority
Tender ID4246717
Organisation NameNew Okhla Industrial Development Authority
Tender BriefMaintenance of Road (c/o R.c.c. Footpath, P/l C.c. Pavement Secvice Road And Raising Of Drain From Helipad And Shilp Haat To Shivdayal School In Sector- 33a) Noida
Last Date For Submission25th May, 2026
Opening Date26 May, 2026
Cost
Document Cost5310.00
EMD387000.00
Estimated Cost16396446.00
Location
CityNoida
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Dismantling Kerb Stone ( Dismantling Kerb Stoneby manual meansand disposal of dismentling material with all hits and up to a lead of 1000metre) as per direction of Engineer-in-Charge.858.00metre
2Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sum on plan) including dressing of sides and amming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil192.00cum
3Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sum on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5mt., direction by engineer-in-charge. The contrector has to detect different utilites like sewer line water supply line elecctric cable telephone cable gas pipe line etc. using utility detecting machine before start of excavetion and shall start of excavetion and shall start excavation only after getting permission of Engineer -in Charge .351.00cum
4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :- 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).268.00cum
5Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concreteNominal concrete 1:3:6 or richer mix (i/c equivalent design mix) . (i/c equivalent design mix) .608.00cum
25th May, 2026

13 Days Left

WhatsApp