Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: New Okhla Industrial Development Authority
Tender ID3996808
Organisation NameNew Okhla Industrial Development Authority
Tender BriefMaintenance of Road ( Construction of Footpath R.c.c Drain C.c Pavement Road Backside Of Ward 5 Sector-29 Resurfacing Of Road Ward 4 Sector-29 And Ward 12a Sector-37 )noida
Last Date For Submission27th Apr, 2026
Opening Date28 Apr, 2026
Cost
Document Cost5310.00
EMD261000.00
Estimated Cost13029078.00
Location
CityNoida
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. The contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge.126.00cum
2Earth work in embankment in ordinary soil, embankment to be done in 20 cm layers, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden roller or steel rammer and rolling every third or top most layer with power roller or minimum 8 tonne including 1.5 m lift and all lead including cartage of earth by mechanical transportation and all T & P labour etc. required for proper completion or work. (earth shall be arranged by the contractor at his own cost from outside of Noida).824.00cum
3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (Zone-III) : derived from natural sources: 8 graded sone aggregate 40 mm nominal size derived from natural sources).207.00cum
4Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars.16565.00Kg
5Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete238.00Sqm
27th Apr, 2026

13 Days Left

WhatsApp