Tender BriefMaintenance of Village (p/f Fabricated Cover And Maintenance of Drain And Cc Road On Makki Masjid Wali Gali In Village Bhangel) Noida
Last Date For Submission23rd Apr, 2026
Opening Date24 Apr, 2026
Cost
Document Cost2124.00
EMD59000.00
Estimated Cost2958031.00
Location
CityNoida
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Providing and laying C.C. pavement of mix M-25 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator , vacuum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of ngineer-incharge. (The panel shuttering work shall be paid for separately). (Note:- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately).99.00cum
2Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately). All works upto plinth level35.00cum
3Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings,balconies and access platform 5.9.315.00Sqm
4Centering and shuttering including strutting, propping etc.Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.(5.9.2)244.00sqm
5Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Thermo-Mechanically Treated bars of grade Fe-500 D or more.2732.00Kg