Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4340936
Organisation NamePublic Works Department
Tender BriefCorrigendum : Jjm/other Deposit Work Scheme In North Tripura 2026-27/ Sh- Construction Of Innovative Water Supply Scheme By Amalgamations Of 4 Nos Sbdtw Followed By 1(one) Cwr (20,000 Gallon) At South Kadamtala Under Dws Sub-division Dharmanagar ( Scheme Id 8401289 )
Last Date For Submission1st Jun, 2026
Opening Date01 Jun, 2026
Cost
Document Cost4000.00
EMD112973.00
Estimated Cost5648670.00
Location
CityNorth Tripura
StateTripura

Register to see full details

BOQ Items
#ItemQtyUnits
1Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.900.00sqm
2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. - All kinds of soil150.00cum
3Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil20.00cum
4Supplying and filling in plinth, under floor, foundations etc. With sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete.16.00cum
5Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level: i) 1:3:6 ( 1 Cement: 3 fine sand : 6 graded stone aggregate 20 mm nominal size)16.00cum
1st Jun, 2026

5 Days Left

WhatsApp