Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: South Eastern Coalfields Limited
Tender ID3657739
Organisation NameSouth Eastern Coalfields Limited
Tender BriefCorrigendum : Drilling Of 06 Nos 200 Mm Dia. Gravel Pack Bore Hole Including Submersible Pump For Domestic Water Supply Of Vindhya Colony Under Nowrozabad Sub Area Of Johilla Area
Last Date For Submission31st Mar, 2026
Opening Date03 Apr, 2026
Cost
Document Cost0.00
EMD68200.00
Estimated Cost5449632.00
Location
CityNOWROZABAD
StateMadhya Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil54.000cum
2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.35.000cum
3Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock14.000cum
4Filling available excavated earth (excluding rock) in trenches, plinth. sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift28.000cum
5Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)37.000cum
31st Mar, 2026

3 Days Left