Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4601152 |
|---|---|
| Organisation Name | South Eastern Coalfields Limited |
| Tender Brief | Corrigendum : Re-arrangement Of 3.3kv Overhead Line At Pali Ug Mines Substation At Pali Sub Area, Johilla Area. |
| Last Date For Submission | 26th Jun, 2026 |
| Opening Date | 27 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 4000.00 |
| Estimated Cost | 316994.00 |
| City | NOWROZABAD |
|---|---|
| State | Madhya Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Re-arrangement of 3.3KV overhead line at Pali UG mines Substation at Pali Sub Area, Johilla Area. | ||
| 2 | Erection of RS Joist pole/'H' beam/steel tubular/steel rail pole of length exceeding 10 metres but not exceeding 15 metres in cement concrete M-10 (1cement:3 core sand: 6 graded stone aggregate 40mm nominal size) base, foundation, muffing including excavation and back refilling etc. as required. | 8.00 | Nos |
| 3 | Supplying and erection of stay set complete (galavanised) with 19/20 mm dia x 1.8 metres long stay rod, anchor plate of size 45 cm x45 cm x 7.5 mm, thimble, stay clamps, turn buckle (20 cm x60 cm),7/4.00 mm dia G.I stay wire and strain insulator etc in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size ) foundation including excavation and refilling etc. as required. | 10.00 | Nos |
| 4 | Dismantling of pole/ street light standard/ strut embedded in brick ballast foundation etc. as required. | 8.00 | Nos |
| 5 | Weaving of cradle guard as required. | 3.00 | Set |
3 Days Left