Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5023885 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Jhanjimura To Khairani Road_road_pothole Repair Using Moorum,wbm,busg, Pmc Andsc_0.690 To 4.320 |
| Last Date For Submission | 3rd Aug, 2026 |
| Opening Date | 04 Aug, 2026 |
| Document Cost | 6000.00 |
|---|---|
| EMD | 28570.00 |
| Estimated Cost | 2857057.00 |
| City | Nuapada |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up ta a distance of 50 metres out side the periphery of the area etc complete | 5,454.000 | sqm |
| 2 | Cleaning the existing black topped surface with removal of foreign materials with brooms or soft brushes and finally dusting with old gunny bags and/or compressed air to receive bituminous. | 5,681.250 | sqm |
| 3 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including pre mixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Clause 406 of MoSRT&H Specifications for Road & Bridge works (4th Revision). | 49.710 | cum |
| 4 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads. Transporting to site by mechanical means within a lead of 5 kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MORTH Specifications for Road & Bridge works (4th Revision) | 69.750 | cum |
| 5 | Supplying & filling moorum of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & T&P required for the work etc. complete as per specification & direction of Engineer in charge. | 181.800 | cum |
13 Days Left