Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5023860 |
|---|---|
| Organisation Name | Rural Works Department |
| Tender Brief | N.h-53 To Gandhi Chhak Pratappur Via Nuapada Kantabania Haradeipur Pratappur_road_sdbc_0.250 To 2.000 |
| Last Date For Submission | 27th Jul, 2026 |
| Opening Date | 28 Jul, 2026 |
| Document Cost | 6000.00 |
|---|---|
| EMD | 22660.00 |
| Estimated Cost | 2265477.00 |
| City | Nuapada |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing and grubbing the road land including uprooting Rank vegetation grass bushes shrubs etc complete and as per direction of Engineer-in-Charge. | 3,920.000 | sqm |
| 2 | Labour for scraping cleaning the road for laying built up spray grout in one layers 37.5 mm thick applying tack coat using 3 kg of bitumen , 0.45 cum of 25 mm to 40 mm size h.g metal and 12 kg of penetration grade bitumen for10 sqm.in each layer with 0.12 cum of 12 mm size h.g.chips as key stones spreading and laying including heating pouring bitumen metal and chips and rolling with PRR with all labour T & P etc. complete. as per direction of Engineer-in-Charge. AR-2006, P-152, SL-28 | 383.370 | sqm |
| 3 | Providing and applying Primer Coat with bitumen emulsion on prepared surface pf granular base including clearing of road surface & spraying primer at the rate of 0.60kg/sqm using mechanical means including all cost, carriage, royality, taxes of materials etc. Using Machinery AR-167,SL-43 | 5,390.000 | sqm |
| 4 | Providing & laying Semi Dense Bituminous Concret with batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder of 60/70 penetration grade of bitumen, transporting the hot mix to site, laying with a hydrostatic paver finisher with sensore control to the required grade, level & alignment, roling with smooth wheeled, vibratory & tandem rollers to achieve the desire compaction as per clause 508 of MoSRT&H Specifications for road and bridge works etc. complete as per direction of EIC. (4th Revision) Page -175 item - 47 | 134.750 | cum |
6 Days Left