| 1 | SUPPLY OF DUAL PLATE CHECK VALVES FOR AG & UG PIPING (R04 BOM) FOR MSB, PFCC, GDS, FF FOR NREP PROJECT including TPI charges as specified in Material Requisition. | | |
| 2 | DUAL PLATE CHK VALVE CS (H2), 600,0, API 594, DOUBLE FLGD,B16.5,RF, DESIGN DUAL PLATE (TYPE A), DOUBLE FLGD (FIG. C.4,API 594), INSTALLATION HORIZ./VERTICAL, ALL WELDS SHALL BE SUBJECTED, TO PWHT., A216 Gr.WCB, 5, SPRING INCONEL X-750, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005,TK-1ZZZA-PI-SPE-0006,, TK-1ZZZA-PI-SPE-0008,TK-1ZZZA-PI-SPE-0009, AND IN-042, VENDOR TO ENSURE ADEQUATE, NUT SPACE BETWEEN FLANGES | 1 | Nos. |
| 3 | DUAL PLATE CHK VALVE CS, 300,0, API 594, DOUBLE FLGD,B16.5,RF, DESIGN DUAL PLATE (TYPE A), DOUBLE FLGD (FIG. C.4,API 594), INSTALLATION HORIZ./VERTICAL, A216 Gr.WCB, 5, SPRING INCONEL X-750, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005,TK-1ZZZA-PI-SPE-0006,, TK-1ZZZA-PI-SPE-0008,TK-1ZZZA-PI-SPE-0009, AND IN-042, VENDOR TO ENSURE ADEQUATE, NUT SPACE BETWEEN FLANGES | 1 | Nos. |
| 4 | DUAL PLATE CHK VALVE CS (H2), 300,0, API 594, DOUBLE FLGD,B16.5,RF, DESIGN DUAL PLATE (TYPE A), DOUBLE FLGD (FIG. C.4,API 594), INSTALLATION HORIZ./VERTICAL, ALL WELDS SHALL BE SUBJECTED, TO PWHT., A216 Gr.WCB, 5, SPRING INCONEL X-750, ADD. INFORMATION, DOCUMENTS TO BE FOLLOWED, TK-1ZZZA-PI-SPE-0005,TK-1ZZZA-PI-SPE-0006,, TK-1ZZZA-PI-SPE-0008,TK-1ZZZA-PI-SPE-0009, AND IN-042, VENDOR TO ENSURE ADEQUATE, NUT SPACE BETWEEN FLANGES | 1 | Nos. |