Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4656356 |
|---|---|
| Organisation Name | Local Self Government Department |
| Tender Brief | Corrigendum : Annual Plan-2025-annual Plan-2026-27/ Pala Municipality -proj.no. 014/27 Kannadiyurumpu Road Maintenance Ward 13, 15-general Civil Work2026/pala Municipality-361/26 Maintenance Of Bus Stand-general Civil Work |
| Last Date For Submission | 25th Jun, 2026 |
| Opening Date | 29 Jun, 2026 |
| Document Cost | 2760.00 |
|---|---|
| EMD | 36015.00 |
| Estimated Cost | 1440610.00 |
| City | Palai |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Road Maintenance | ||
| 2 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 8.600 | sqm |
| 3 | OD25233/2026-2027:(OD derived from MorD 75.5.9.1.2pb): Providing, laying and rolling of open-graded premix composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as undulation levelling course including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by Mix Seal surfacing of either Type A or Type B or Type C - Case - I By Manual Means - Bitumen (S-65) - Packed bitumen Rates Unit = cum. Taking output = 500 sqm (10 cum of compacted thickness). | 6.912 | cum |
| 4 | 75.5.2.4pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.30 to 0.35 kg per sqm on the prepared non-bituminous surfaces (cement concrete pavement) cleaned with Hydraulic broom as per Technical Specification Clause 503. | 1575.000 | sqm |
| 5 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 1925.000 | sqm |
Ending Today