| Tender ID | 4620088 |
|---|---|
| Organisation Name | Kerala State Electricity Board |
| Tender Brief | Corrigendum : Construction Of 8.5km 33kv Single Circuit Line From 110kv Substation, Chittur To 33kv Substation Site Thathamangalam Including Supply, Installation Testing And Commissioning Of 33kv Xlpe Ccsx 159 Sqmm Aaac Covered Conductor. |
| Last Date For Submission | 6th Jul, 2026 |
| Opening Date | 09 Jul, 2026 |
| Document Cost | 8850.00 |
|---|---|
| EMD | 100000.00 |
| Estimated Cost | 48788388.00 |
| City | Palakkad |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Labour | ||
| 2 | Constructing Transformer plinth of size 1.5x1.5x1.5m on 1.8x1.8x0.75 m basement inclusive of cost of all materials. [Excavation 1.8x1.8x0.75m, Random Rubble in CM(1:6) 1.8x1.8x0.75m + 1.5x1.5x1.5m, concrete (1:2:4, 20mm) 1.5x1.5x0.10 m, plaster CM (1:3) 12mm, 1.5x1.5m, Pointing CM (1:3) 1.5x1.5mx 4 sides] | 1.000 | Nos |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan ), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 568.500 | Cub.m |
| 4 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. - Ordinary rock | 454.800 | Cub.m |
| 5 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Hard rock (blasting prohibited) | 113.700 | Cub.m |