Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Kerala Electrical And Allied Engineering Company Limited
Tender ID4380051
Organisation NameKerala Electrical And Allied Engineering Company Limited
Tender BriefCorrigendum : Lac-ads-ottapalam Lac-budget 2025-26 Annexure Ii Volume Ii Thanneerpanthal Thumbakkani Road In Palakkad District
Last Date For Submission8th Jun, 2026
Opening Date09 Jun, 2026
Cost
Document Cost2950.00
EMD50000.00
Estimated Cost8057151.00
Location
CityPalakkad
StateKerala

Register to see full details

BOQ Items
#ItemQtyUnits
1ROAD WORK
22.2.1.B:Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.(I) By Manual Means (B) In area of thorny jungle0.146Hectare
33.2:Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.2572.500sqm
43.5.3:Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3322.500cum
53.15.2:Compacting Original Ground (ii) Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.412.445cum
8th Jun, 2026

8 Days Left

WhatsApp